Dock Piling Repair in Miami
Dock piling repair in Miami can mean a jacket on a pile that's still sound, or a new pile in the same spot. Miami-Dade handles those two jobs differently.
Jacketing a pile
Is the pile still straight but chewed up near the waterline? A jacket is on the county's exempt list:
The following is a list of projects that are exempt from a Class I Permit.
- (p) The placement of concrete jackets or other forms of protection on existing dock, pier or mooring piles.
Replacing fender and mooring piles
Swapping one also made the list, with strings attached. All three apply.
- (q) The replacement of fender piles or mooring piles at the same exact location as they presently exist and provided that the following criteria are adhered to:
- (i) The fender piles or mooring piles to be replaced do not protrude into the water more than twenty-five (25) percent of the width of the waterway.
- (ii) The work will be done by a contractor holding an applicable certificate of competency.
- (iii) The contractor shall contact the Director or the Director's designee a minimum of twenty-four (24) hours prior to performing the fender pile or mooring pile replacement work with information on the location and the number of fender or mooring piles to be replaced.
The 24-hour call is the contractor's job, not yours.
Piles that hold up the deck
Replacing a support pile isn't in those items. The short form list covers dock repair more broadly:
When permissible, a short form permit application may be accepted by the Department of Regulatory and Economic Resources for the following types of work:
- 3. Repair, replacement or restoration of docks, piers, davits, boat lifts, mooring or fender piles, provided none of the foregoing protrude into the water more than twenty-five (25) percent of the width of the waterway.
And the plans have to show this:
Plan view of all existing structures, (including all piles, davits, davit pads, etc.) clearly indicating which of these structures will remain and which will be removed, and indicating all applicable dimensions
Every pile gets counted before anyone draws a thing. Storm damage? Read storm damaged dock repair.